With the current season coming to an end and the close season beginning. The World Cup will come and go. The Fixtures will be published and the new season will soon begin.
For much of the season I have learnt it is about getting ready for the next match, clearing up after the last one. carrying out repairs, constantly watching the weather forecast and generally just managing situations around the weather. Doing things when you can and being flexible when it turns bad. Looking for solutions and where to source items. Forever asking for favours. The close season will begin and the maintenance work begins in earnest. The weather will hopefully be kind Below is the list of jobs that require completion during the pre-season. These are ones for the volunteers to work on . Larger ones will be done by Mick and Ian. Some we will work on to together Most involve painting others have some small maintenance work involved. There are some that will need doing urgently before the end of May. There will be a couple of evenings when we may ask for volunteers to assist. There will be possibly a Saturday when we will try to get everyone together to target areas if we fall behind or need a pushto get ahead. The more hands there are the quicker we will complete the work. If you can help use the email form below.
South stand turnstiles 23-26 Rub down internal and external doors prime,undercoat,black gloss
South stand turnstile 23-26 counters rub down undercoat and black gloss Habbin south,North & South terrace + South stand advert capping to be replaced and painted approx. 110 meters in total Habbin south turnstiles 20-22 ( Brickwork requires attention remove top 2 /3 courses and replace with top course being engineering brick) followed by decoration of brickwork white masonry Habbin north & south barriers wash down, (rub down paint with metal paint hammerite) Habbin north & south front barrier special attention to the base 200mm North terrace front rail barrier rub down paint with black metal paint North terrace barriers wash down and paint with black metal paint North terrace exterior end walls paint with yellow masonry paint Main stand metal stairs and concrete steps re-line in yellow hammerite and yellow road line paint South stand stairways and steps re-edge in yellow road line paint Habbin south external toilet walls (white masonry paint) Habbin south toilets external doors(rub down undercoat and yellow gloss Habbin south male and female internal toilet walls ( white masonry paint) Exit gates 24 & 26 Habbin south rub down and red gloss Habbin south turnstile external and internal doors (rub down undercoat and gloss yellow) Tea bar 4 timbers require rub down, undercoat and gloss Habbin south turnstile external and internal doors (rub down undercoat and gloss yellow) Habbin north exit gates 37 & 38 re-paint red gloss Habbin north exit gate 39 rear of Habbin ( rub down paint red gloss) Ladies and gents toilets at the North end clean down and re-paint All track perimeter emergency gates, touch up with red gloss paint Habbin stand/north terrace walk ways re-apply yellow road line paint North terrace exit gates 1,44,45 rub down undercoat and gloss n red North terrace disabled toilet clean down walls re-paint in white emulsion Exit gate number 3 Cut Throat lane rub down re-paint red gloss Mainstand rear exit doors 4 & 6 rub down and re-paint South stand pedestrian gate number 20 (rub down paint with galvanised paint) Control room external door (rub down paint with grey sadolin) South stand tea bar doors (rub down paint with grey sadolin) South stand external toilet doors (rub down paint with grey sadolins) South stand tea bar sills (rub down u/c and black gloss) South stand toilet internal walls (decorate white masonry paint 2 meters in height) South stand toilet Galvanised pipe protection (rub down paint with black Hammerite) South stand external service entrance doors (rub down paint with grey saddolins) Habbin south tunnel 28 (decorate with white smooth masonry paint) Security fence alongside exit gate 26 ( rub down paint with galvanised paint) Habbin north male and female toilets rub down external /internal walls decorate white masonry paint) Habbin north turnstile doors 16-19 rub down undercoat /gloss yellow Habbin north tunnel 33 white masonry Hand rail rear of Habbin north exit gate 40 alongside ditch (rub down gloss paint black) Habbin stand rear external wall (decorate with white masonry) Habbin tunnel 40 clean down paint with white masonry paint North terrace turnstile area paint internal walls white masonry and doors in yellow gloss North terrace power house doors and window rub down undercoat and gloss Car park 1 generator housing wash down and re-paint with zinc metal paint B block window frame timbers require rub down and repaint Mainstand black steel work wash down re-apply black metal paint A & G block concrete face below seats re=paint with white masonry paint
0 Comments
Your comment will be posted after it is approved.
Leave a Reply. |
Archives
April 2022
Categories
All
|