Earlier this year Ian drew up a list of work required around the Abbey Stadium. Last month we walked around the ground again and brought it up to date. Some of the work on the orginal list is still to be done. Additional items to that list have been completed.
Thank you to everyone who has helped provide materials and has carried out the work Much of below will depend on the weather now Below is the latest list of work we are looking at doing - External gas pipe control room paint yellow gloss Main stand galvanised hand rails rub down rusty areas and paint with galverfroid Tarmac area below control room / pylon requires attention Main stand timbers, capping repair , replace damaged timbers and re-paint Ladies and gents toilet F block end of Main stand yellow gloss Mens toilet F block steel screen paint black and re-write men’s toilet Window sills rear of Main Stand re-gloss white Abbey arms rear wall new marine ply required and re-paint Physio back door gloss paint yellow Board room,8 build external timbers repair plywood areas, Trim back trees and shrubs around car park areas and front of stadium Clean out all gulley pots and gutters Clean up cut throat lane outside gate 47 Exit gate 3 rub down repaint Red gloss Tea bar store at tea bar 1 remove wire surround clean up repaint window frames, external door, North Terrace Hill sign paint reverse side of timber white. Money room cut throat lane doors rub down , u/c gloss Turnstiles 1-5 internal doors gloss yellow North terrace rear wall/passage paint between shirts North terrace rear wall metal bracing rubdown and paint North terrace turnstiles 6-13 external doors u/c and gloss, external walls white and black bitumastic North terrace mobility bays and hatching repaint bays and numbers Gate 42 steelwork black gloss North terrace & Habbin terrace step repairs / concrete Habbin exit gate 40 + turnstiles 14/15 doors gloss Habbin tunnel 33 cage steel work rub down paint Habbin rear wall between gates 39-40 repaint Exit gates 37 & 38 rubdown and re-paint Habbin stand north & south ladies and gents toilet walls repaint + damp course + window frames Habbin tunnel 28 brickwork repair South stand turnstiles 23-26 doors and framework externals paint Habbin south tea bar 5 end wall paint South stand entrance clear moss from tarmac Habbin stand , South stand common entrances clean up cut back shrubs / weedkill South stand entrance from common rub down steel clear rust and paint South stand yellow downpipe gloss paint South stand tea bar sills rub down u/c and gloss South stand internal toilet walls masonry paint white External Tunnel doors main stand corridor uc/ & gloss black and amber
0 Comments
Your comment will be posted after it is approved.
Leave a Reply. |
Archives
April 2022
Categories
All
|